Crotched Mountain Valley Double
August 8, 2002

This Valley Double will be removed, and a Riblet quad will be installed in its place. This quad will be located on the eastern edge of the trail, with snowgun towers on the right hand side. This is a classic Hall, but was originally a bubble top quad. The vertical is about 550 feet.

The base of the double. Notice how the lift towers are disappearing into tree growth! This will be cleared out soon.

 

A double chair near the base of the lift.

The liftline trail, very grown in.


About halfway up the lift, looking down.

Looking up the lift line, halfway up.

A closeup of a dangling chair near the summit.
The upper portion of the double chair.

The summit terminal of the lift.

Back to Crotched Mountain Rebirth